Bombardier Shop A

Project Description

This major strip and re-sheet refurbishment project phased over a period of 3 years uses KGM's on-site expertise and knowledge.

After stripping the existing fibre cement roofing, KGM installed Kingspan composite RW roof panelling and DLTR polycarbonate rooflights, upgrading the roof so that it complies with current part L2 of the Building Regulations as well as giving the client a manufacturer’s guarantee lasting 25 years for the products installed.

The installation procedure means KGM using 'crashdeck' technology, which enables production to continue during the re-roofing works.

Remedial works were carried out in phased installation periods to suit the client’s requirements.

Project Info

  • Client: Volker Fitzpatrick Construction
  • Location: Ilford Stabling Yard
  • Service: Refurbishment, Roofing
  • Sector: Industrial